Weekly Report – Corpus Christi, Texas RV

March 20, 2017

We had a good and productive week at Corpus Christi. Work is progressing at Jessie and Hilmas’s home. The drywall and painting were finished in the bathroom and entry way ceiling. A tub surround was installed and Jake repaired and replaced two screen doors.

Mic and Elenore painted beadboard, which needs to be installed at Reynaldo’s home. Siding was removed and replaced by Wayne, Val, and Henry.

The kitchen floor was repaired and the subfloor was installed at Thelma’s home. Vinyl floor covering was also installed along with new lower kitchen cabinets and a countertop. Baseboard and casing was applied. This completed the project at Thelma’s and the job card was signed and completed.

Submitted by Lisa Schamback