Responding Rebuilding Restoring

Marble Falls, Texas

Disaster Description

Marble Falls, Texas was founded in 1887. Falls of Limestone which was mistaken as marble let to the naming of the city. A dam has since been build to form Lake Marble Falls on the Colorado River. The falls are now under water and only visible on those rare occasions when the lake is lowered for repairs.

In the summer of 2007 over 18 inches of rain fell in a few hours in the Marble Falls area. Authorities estimate that approximately 150 businesses and homes were damaged by flood waters.

Volunteers serving with MDS built two new homes in the area in the fall of 2008 and winter of 2009.  During that time, they stayed at the Camp of the Hills.

Camp of the Hills is a nonprofit 501c3 Christian summer camp located in the Texas Hill Country outside of Marble Falls, TX that serves at-risk youth. The nondenominational camp is celebrating its twentieth year in operation and has served over 9,000 campers with a staff of volunteer counselors and work crews. 

In the spring of 2010, one of the camps large buildings caught fire and was reported as a total loss.  While the building was insured, insurance will not cover the total cost of rebuilding.    

MDS Response

MDS volunteers will work alongside camp personnel in the rebuilding efforts. MDS volunteers will once again be able to park their RV’s on camp property during the rebuilding process.

Photo Gallery

Cutting-up-a-heavy-tarp

Cutting up a heavy tarp.

Marv-the-expert-paintbrush-

Marv, the expert paintbrush cleaner.

2-Neil-and-Anita intall drywall in kitchen

Neil and Anita install drywall in the kitchen building.

Admiring-the-weeks-work

Admiring the week's work.

April MDS team

The long-term volunteer group in April.

Mary, Agnes, Linda and Henrietta clean out the sports equipment storage.

Mary, Agnes, Linda and Henrietta clean out the sports equipment storage.

All-in-preparation-for-the-

Preparation for the large floor.

Linda,-Nettie-and-Ena-paint

Linda, Nettie and Ena painting inside.

Agnes-varnishing-doors

Agnes varnishes the doors.

The-floor-for-the-main-camp

The floor for the main camp building is finished.

Admiring-the-excellent-floo

The crew from Winkler, MB admires their work in Marble Falls, TX. Their group poured the floor for the main camp building.

Winkler-crew-enjoying-a-mea

The Winkler crew enjoys a meal together.

Thanks-to-the-Winkler-crew

Thanks to the Winkler crew the floor of the main building is complete.

Mike-installs-laminate-in-B

Mike installs the laminate.

Linda,-Ena-and-Agnes-applyi

Linda, Ena and Agnes apply varnish.

Agnes-cleans-up-spills

Agnes cleans up the spills.

Mary---secure-in-her-positi

Mary is secure in her position.

Henrietta-and-Linda-on-the-

Henrietta and Linda on the scissors lift.

Mike-watering-down-the-new-

Mike waters down the new floor.

Ben-sitting-down-on-the-job

Ben is sitting down on the job.

Ena-reporting-for-work

Ena reports for work.

Applying-rust-proofing-in-t

Applying rust proofing in the peak.

Lloyd,-Bernie-and-Marv-raki

Lloyd, Bernie and Marv raking gravel into place.

Porch-slab-on-main-camp-bui

Porch slab on main camp building is almost finished.

Pot-luck-meal-with-RVIC-gro

Pot luck meal with RVIC group.

Pie-break

Enjoying a pie break.

Enjoying-a-break-outdoors

Enjoying an outdoor break.

Laying-steel-for-the-final-

Laying the steel for the final floor pour.

Pete-secures-the-wall

Pete secures the wall.

Two-thirds-of-the-exterior-

Two thirds of the exterior walls were up by the end of the week.

Lloyd-installs-door-frames

Lloyd installs door frames.

All-but-2-interior-walls-we

All but two interior walls were up by the end of the week.

Milo-and-Dana-install-windo

Milo and Dana install windows.

Sherm-assisting-with-moving

Sherm assists moving an completed wall.

Nancy-and-La Vonne-building-

Nancy and LaVonne building walls.

A few of the interior walls are up in the Dining Building

A few of the interior walls are up in the dining room building.

Dana installs the receptical boxes

Dana installs receptical boxes.

We enjoy playing games in the Office Trailer

RV volunteers enjoy playing games in the office trailer.

Most of the walls are enclosed on the Dining Building

Most of the walls are enclosed on the dining room building.

Two-thirds-of-the-exterior- 01

Two-thirds of the exterior walls are done.

Ron-&-Pete-installing-the-S

Ron and Pete installing the exterior fireproof sheet rock.

Betty-and-Joanne-building-wal

Betty and Joanne building walls.

Bill-and-Ron-installing-inter

Bill and Ron installing interior walls.

Corrine-marking-the-drywall

Corrine marking the drywall.

La Vonne-mastered-the-skill-

LaVonne mastered the skill of cutting drywall with a router.

Mary-Ann-learned-how-to-use

Mary Ann learned how to use a reciprocal saw.

Mary-building-interior-wall

Mary building interior walls.

The-huge-Dining-Kitchen-bu

The huge Dining/Kitchen building as seen from the bottom of the hill.

The-Office Nurses-Building

The office/nurse station building.

Trudy-securing-the-wall-to-

Trudy secures the wall together.

Werner-Pete-and Sherm-up-on-

Werner, Pete and Sherm up on the lift.

Betty-helping-Rick-install-

Betty and Rick installing the ceiling framing.

Walking-up-the-steep-hill-i

Walking up the steep hill to begin our work day.

Betty-Milo-Pete-and-La Vonne

Betty, Milo, Pete and LaVonne got drenched on our boat ride!

Ben-and-Bill-installing-dry

Ben and Bill installing drywall.

Mary-La Vonne-Joanne-mudding

Mary, LaVonne and Joanne mudding.

Waving-white-hankies-while-

Waving white hankies as we bid farewll to some long-termers.

Joanne-and-Corrine-mudding.

Joanne and Corrine mudding.

Enjoying-the-hospitality-at

Enjoying the hospitality at Ellie and Dan's house.

Ben-and-Mary-are-ready-to-l

Ben and Mary are ready to leave.

Enjoying-the-boat-ride

Enjoying the boat ride.

Roasting-wieners-after-the-

Hot dog roast in the evening.

The-January-Group

The January group of RV volunteers.

Trudy-and-Mary-screwing-on-

Trudy and Mary installing drywall.

A-waffle-feast

We all enjoy the waffle feast.

Gladys-sanding

Gladys sands the drywall.

Lloyd-mudding

Lloyd works on mudding the drywall.

Sweeping-the-snow-on-Friday

Sweeping the snow off the walkway.

The-ladies-cutting-up-venis

The ladies cut up venison that was donated.

The-men-puzzled-when-it-was

Enjoying time together when the weather stops the work.

The-Super-Bowl-Party

Enjoying the football game together.

Pot-luck-lunch-when-it-too cold to work

Potluck lunch when it's too cold to work outside.

Joanne and Betty install elec boxes in kitchen

Joanne and Betty install electrical boxes in the kitchen.

Nancy-entertains-us-on-Vale

Nancy entertains us on Valentines Day.

Neil and Gladys install drywall in kitchen building

Neil and Gladys install drywall in the kitchen building.

Pete and Al mark the window frames

Pete and Al mark the window frames for Joanne and Betty.

Valentines-dinner

The Marble Falls volunteer group celebrates Valentine's Day.

Walls and ceilings have been insulated in the office building

The walls and ceilings have been insulated in the office building.

La Vonne-using-the-Tape-Mach

LaVonne uses the tape machine.

Lloyd-built-and-installed-t

Lloyd built and installed the arch for the meeting room.

Neil-applying-the-final-coa

Neil applys the final coat of mud.

Pete-hepling-with-the-arche

Pete helps with the arches.

Ron-Sherm-and-Pete-built-th

Ron, Sherm, and Pete built the framing for the counter in the kitchen.

The-February-Group

The February group of long-term volunteers.

The-mudding-and-taping-in-t

The meeting room.

When-a-frame-is-build-insid

The frame had to be lifted over the doorway.

Lloyd-and-Anita-showing-off

Lloyd and Anita showing off the stained floor.

Lloyd-trowling-the-texture

Lloyd trowling the texture on the walls.

Nancy-and-Ben-clean-up

Nancy and Ben clean up the work site.

Neil-spraying-texture-on-th

Neil spraying texture on the wall.

The-Kitchen-walls-are-drywa

The kitchen is drywalled.

Helen, Mary, Betty and Lloyd discussing painting detail

Harry, Mary, Betty and Lloyd discussing painting detail.

Betty drying a concrete patch with a hairdryer

Betty drying a concrete patch with a hairdryer.

Neil Schmidt, Lloyd and Len mixing mud

Neil, Lloyd and Len mixing mud.

Ben and Albert lifting sheetrock for high ceiling

Ben and Albert lift sheetrock for the high ceiling.

Hallway floor stained

The hallway floor is stained.

Dana continuing with plumbing

Dana continues to work on the plumbing.

Ruth and Erna learning to tape drywall

Ruth and Erna learning to tape drywall.

Nettie with the splatter hopper

Nettie with the splatter hopper.

Neil Friesen patient with drywall knife

Neil is patient with the drywall knife.

Anita and Nettie on mudding detail

Anita and Nettie on mudding detail.

Allan and helper on electrical in chapel building

Allan and helper work on the electrical in the chapel building.

Beautiful picture

RV volunteers work together with Hesston students.

Betty and Helen staining outdoors

Betty and Helen staining boards outdoors.

Darin and Len looking busy

Darin and Len looking busy.

Enjoying the fish fry potluck meal

Enjoying the fish fry potluck meal.

Hesston College group

Students from Hesston College joined the Marble Falls RV group for a week.

Intergenerational plumbers

Intergenerational plumbers.

Our favorite bandit

Installing drywall in Marble Falls.

Russ on his knees

The instructor on his knees.

Ruth and Leah painting walls

Ruth and Leah painting walls.

Student on electrical

Hesston student volunteer works on the wiring.

Students pulling wires

Hesston students help pull wires.

Texturing from the lift

Texturing from the lift.

The chefs

The project chefs made a great meal!

Xing-proud-of-his-new-skill

Xing is proud of new skills he learned as his college group volunteered with senior volunteers at the Marble Falls, TX project.

Enjoying the fish fry potluck meal 01

Enjoying the fish fry potluck with the Hesston students.

Hesston College group 01

The Hesston College group at Marble Falls.

Intergenerational plumbers 01

Intergenerational plumbers.

Painters pose

Intergenerational painters.

Student on electrical 01

Hesston student working on the electrical.

Students pulling wires 01

Students pull wires.

Ben-and-Albert-install-beams

Ben and Albert install beams.

Betty-and-Nettie-work-on-windows

Betty and Nettie work on windows.

Len-and-Neil-install-ceiling-grid

Len and Neil install ceiling grids.

Lloyd-begins-baseboard

Lloyd starts the baseboards.

March-group-of-volunteers

March group of volunteers.

Mary-and-Erna-on-doors

Mary and Erna work on the doors.

Alan our electrician looking for parts

Alan, our electrician, looking for parts.

Albert on door installation

Albert installing doors.

Alvin on clean-up

Alvin's cleaning up.

Anita and Ruth painting on exterior of Administration Building

Anita and Ruth paint the exterior of the Administration building.

Ben carrying a window frame

Ben carrying a window frame.

Betty Russ and Helen ready for work

Betty, Russ and Helen are ready to get to work.

Camp Director Mel Bowman receives gift from MDS volunteers

Camp Director, Mel Bowman, receives a gift from the MDS Volunteers.

Dining room cleaned up and ready for wall texture

The dining room is cleaned up and ready for wall texture.

Doreen sanding doors

Doreen sands more doors.

Erna stains alder door

Erma stains the door.

Helen and Irene staining doors

Helen and Irene staining doors.

Len installing lights

Len installing lights.

Lloyd staining concrete floor

Lloyd staining the concrete floor.

Mary Ann and Doreen staining exterior doors

Mary Ann and Doreen staining exterior doors.

Neil happy installing plate covers

Neil is happily installing plate covers.

Neil Schmidt cutting baseboard

Neil cutting baseboards.

Nettie staining doors

Nettie staining doors.

Pete and Dana install bathroom fixture

Pete and Dana install bathroom fixtures.

Volunteers wait for dedication program to begin

Volunteers at the dedication program.

Alvin at work

Alvin at work.

Ben and Russ preparing cedar supports

Ben and Russ preparing cedar supports at the Marble Falls, TX project.

Cafeteria building front

The front of the cafeteria building.

Dean working with cabinets

Dean is working on the cabinets.

Doreen cleaning floors

Doreen is cleaning floors.

Enjoying a potluck outdoors

Enjoying an outdoor potluck dinner.

Len welding platform for airconditioner

Len is welding a platform for the air conditioner.

Lloyd cuts tubing

Lloyd cuts metal tubing.

Nettie applying final sealer

Nettie applying the final sealer.

Ruth on her last week of work

Ruth on her last week of work.

Barb Dean and Lloyd sanding doors

Barb, Dean and Lloyd sanding doors.

Ceiling in Dining Hall (2)

Ceiling in the dining hall.

Dean staining a vanity cabinet

Dean stains a vanity cabinet.

Len working with gas pipes

Len working with the gas pipes.

Lloyd and Ben begin cabinet installation

Lloyd and Ben begin cabinet installation.

Mary Nettie and Irene staining drawers

Mary, Nettie and Irene staining drawers.

Vickis new office

Vicki in her new office.

Project Reports

Weekly Report from Marble Falls RV

April 15, 2011

The thunder and lightning kept us awake one night, but the rain was so worth it. Even mud was welcome! Local folks have said that this spring is unseasonably warm, but those of us from up north certainly haven’t...[more]

Category: Marble Falls, Tx


Displaying results 1 to 1 out of 41
<< First < Previous 1-1 2-2 3-3 4-4 5-5 6-6 7-7 Next > Last >>

Map/Directions

Project statistics

MDS Marble Falls
Camp of the Hills
1552 CR 344
Marble Falls, Texas 78654

Project Directors: Lloyd and Irene Letkeman

Project Director (717) 725-9961

Office Manager (717) 682-5796

marblefallsrv(at)mds.mennonite.net

Project Open Date: October 6, 2008

Volunteer Status: Project is closed

Volunteers to Date: 72

Jobs Started: 1

Jobs Completed: 0

Project End Date: March 31, 2009

Project Schedule

Project re-opens on November 1, 2010

*Note: Because of liability issues, absolutely no pets are allowed on the RV campus, even if they are inside the RV.  

Current Situation
05-17-2012


fair
68°F
Sunrise 06:35 am
Sunset 08:21 pm

Photo and Multimedia Galleries