
The remnants of Hurrcane Ivan dumped 9 inches of rain on Pittsburgh within a 48 hour period. Debris in the creeks and streams, clogged the waterways and prevented drainage causing them to overflow their banks. In some residential areas a 9 foot wall of water swept through, causing major damage.
Project End Date: TBA
Volunteer Status: Project now complete
Volunteers To Date: 223
Jobs Started: 23
Jobs Completed: 23
no news in this list.
Pittsburgh, PA
285 Bellevue
Pittsburgh, PA 15229
Phone: 412-931-0248
pittsburgh@mds.mennonite.net
|