San-Jose-Day-218
Conference attendees work on the Panel House in San Jose.
San-Jose-Day-120
Framing walls for the panel house.
Dulac
Putting the panel house together in Dulac.
Dulac 2
Putting the pieces together in Dulac.
Dulac 3
The house is all back together.
OJ Darrel and Dana working on Edger s deck
OJ, Darrel and Dana work on Edger's deck.
Ms-Linda s-family-and-us- 3
Ms. Linda's family and the MDS RV volunteers.
MDS-RV-ville
The MDS RV village in Newton.
Ivan-completed-Ms-Emma s-ne
Ivan completed Ms. Emma's new kitchen.
The-landscapers
The landscapers at work.
Newton-MDSers-helping-the-R
Newton volunteers help the RV volunteers on their project.
Ms-Emma-with-her-new-cupboa
Miss Emma and her new cupboards.
Jerry-and-Ivan
Jerry and Ivan discuss the details.
Front-porch-construction
Front porch construction.
Nancy -Betty -and-Teena-pai
Nancy, Betty and Teena painting siding.
House-wrapping
House wrapping.
Jerry-enjoying-his-house-co
Client Jerry, enjoying his house construction.
Mosley-House-Dedication
Volunteers and new homeowners dedicate the house.
Volunteers and clients in front of the finished house
Volunteers and new homeowners on the porch of the new home in Newton.
Moseleys with quilt at dedication
The new homeowners are presented with a quilted wall hanging.
Point-Aux-Chene-2
A renovation project in Point Aux Chene
Point-Aux-Chene-3
Presentation of a quilt at the home dedication.
Chunchula
Installing cabinets in Chunchula
Bayou-La-Batre-3
Working out the details in Bayou La Batre.
Hackberry-2
Volunteers in Hackberry, Louisiana.
Princeville-1
Framing a Holiday House in Princeville.
Princeville 2
Houses in Princeville
Princeville 3
Working on the Holiday Homes in Princeville.
Metarie
Roofing in Metarie.
Metarie-2
Pittsburgh-2
Checking on progress at a project in Pittsburgh.
Pittsburgh
Inspecting the work at a Pittsburgh project.
Palacios-Melvin-from-Oklaho
MDS volunteer Melvin works at a project in Palacios.
Terrace-volunteer-group
Volunteers at the House Dedication in Terrace.
House-dedication-in-Terrace
House Dedication in Terrace.
Making-foundation-forms.
Volunteers make foundation forms.
The-joists-are-on
The joists are on the piers.
Two-short-term-volunteers-m
Short-term volunteers in New Iberia make good use of the chop-saw.
The-walls-are-up
The walls are up on the project in New Iberia.
Foundation-forms-waiting-for concrete New Iberia
Foundation forms waiting for concrete.
Tabor-College-student-goes-
Tabor College volunteer in New Iberia.
Digging-holes-for-the-deck-
Digging holes for the deck supports.
LTV-Leonard-Kennel-in-the-r
Long-termer Leonard is in the rafters.
Progress-at-4-weeks.
Progress at four weeks.
Working on the house
Working under the house.
Nailing the roof
MDS volunteers work on a roof in New Iberia, Louisiana.
Rudy Janzen
Rudy works on the trusses.
Mr. L s kitchen-after
Mr. L's kitchen after MDS volunteers worked on his house.
Mr. L s kitchen-before
Mr. L's kitchen before the work begins.
Alvy Roth delivers much needed scaffolding
Alvy delivers much needed scaffolding.
Miss-Eloise s-House
Miss Eloise's house.
Mr-Frank s-house
Mr. Frank's house.
Miss-Woogie-by-her-new-home
Miss Woogie by her new home.
Working-on-Woogie s-House--
Working on Miss Woogie's house.
Kitchen- -Office-Staff---Ph
The kitchen and office staff in New Iberia.
Crew-Leader s-meeting
The crew leaders meet to discuss the progress.
Woogie- -Elouise-visiting-t
Clients, Miss Woogie and Miss Elouise, visit the MDS camp.
Mr-Frank-and-Peter
Client, Mr. Frank, with Project Director, Peter.
Singing-before-devotional-t
Volunteers lead singing before devotions.
Taping---photo-by-L.-Schroe
Volunteers work on taping. -photo by L. Schroeder
Wachula
Framing out the doors in Wachula
Wachula-2
Completing the house wrap at a project in Wauchula.
Barriere-1
Volunteer group at Barriere.
Barriere-Boys-Building-Shed
Youth work on sheds in Barriere.
Barriere-Shed-Building-13
Building sheds at the youth project in Barriere.
Julian-1
Fire clean-up in Julian.
Julian-2 01
Clean-up in Julian, California.
Century
Damage in Century, Florida.
Century-Group-1-023 02
Clearing fallen trees in Century.
framing-in-arcadia2
Framing at a project in Arcadia.
Arcadia-2
All ages work together at an MDS project.
Outside-view-2
Mr. R's home is nearly complete.
Long-termer-in-Pass
Long-term volunteer in Pass Christian.
Teaching-Youth-Volunteers
Teaching youth volunteers in Pass Christian.
DSC02105
DSC02111
Working on the trusses.
DSC02106
Volunteers work in Pass Christian.
DSC02112
Working up in the rafters.
DSC02110
Working on the trusses.
Top-notch-cooks-in-Pass-Chr
Top notch cooks prepare food for the volunteers at the Pass Christian Project.
Vols-from-Pickens-Menn-Ch
Volunteers from Pickens Mennonite Church work on the roof.
Youth-Volunteers-at-D-house
Youth volunteers at the D house.
barbara-feb-3-09-06-Newton
Taking off the old shingles.
Mosley jan 28 09 web 1
Cutting the boards.
Camp-building
Camp building in Newton.
Bess-feb-3-09-9-Newton
The group working on Bess' house in Newton, Texas.
jerry-feb-3-09-12-Newton
Painting boards for Jerry's house.
Watch-out-for-the-toe
Watch out for those toes!
mosley Jan 19 09 web 12
Working on the foundation for Jerry's house.
Thomas Jan 28 09 04
Taking off the old shingles.
UMC house wrapping
Installing house wrap on the F house.
bess Jan 19 09 web 10
Painting siding on Bess' house.
Folwer Jan 27 09 01
House wrap is complete on the F house in Newton.
Mosley Jan 27 09 04
Framing at Jerry's house in Newton.
fowler jan 19 09 web 07
Working on the roof at the F house.
bess Jan 19 09 web 15
Bess' new house is next to the old house.
Folwer Jan 27 09 12
Working hard at the F house.
Jarrell Jan 22 09 web 09
Week two group at Bess' house.
mosley Jan 19 09 web 04
Week two shows lots of progress at Jerry's house.
bess Jan 19 09 web 08
Painting the outside of Bess' house.
Thomas Jan 28 09 06
Clearing off the old shingles from Burnice's roof.
Folwer Jan 27 09 07
Cutting the lumber to size.
fowler jan 19 09 web 09
Roofing in Newton, Texas.
mosley Jan 22 09 web 2
The week two group that worked on Jerry's house.
Mosley Jan 27 09 12
Working on and in the floor joists in Newton, Texas.
Jerry-jan-29-09-01-Newton
Installing house wrap on Jerry's house.
barbara-feb-3-09-23-Newton
Volunteers from Pennsylvania work on the roof at Barbara's house.
jerry-feb-3-09-02-Newton
Siding at Jerry's house.
Jerry-jan-29-09-14Newton
Finishing the steps at Jerry's house.
barbara-feb-3-09-25-Newton
Removing old roofing materials.
fowler-feb-2-09-08-Newton
Working up in the rafters.
barbara-feb-3-09-03-Newton
Volunteer from Pennsylvania works on the roof in Newton, Texas.
Bess-feb-3-09-8-Newton
Putting on the finishing touches.
samuel-house-dedication-026
House dedication and tree planting in Newton, Texas.
Mosley-feb-25-09-09
Jerry and Rebecca receive the keys to their new home.
Ford-foundation-
Fixing the foundation at Mr. F's house.
Foundation-repair----Ford
Getting to the bottom of the problem at Mr. F's house.
Fowler-jan-15-web-03
Framing up Jerry's house.
jack-feb-17-09-
Jack stands in front of the new roof MDS volunteers put on his house.
Ford-feb-17-09-
The work is almost complete.
McCarty-jan-8-web-7
Staining cupboard doors for the kitchen at the M house.
Ford-feb-12 -2009-5
Making the necessary adjustments to the steps.
Carver-web-15
Beginning the foundation at the C house in Newton, Texas.
Julie-Kaufman-11
All suited up to work! -photo by Julie Kaufman
Hayne-Blvd
MDS building in New Orleans.
Painting-in-New-Orleans
A volunteer paints trim at a project in New Orleans.
The-D-family
The D family in front of their house.
Julie-Kaufman-9
Working together on the railing. -photo by Julie Kaufman
Cutting-the-studs
Framing in New Orleans.
Catalina-and-Lloyd-and-the-
Catalina and Lloyd and the new ramp.
Framing-in-New-Orleans-2
Youth volunteer framing in New Orleans.
Julie-Kaufman-8
Building the railing. -photo by Julie Kaufman
Break-time-at-Mr-Cs-house
Break time at Mr. C's house in New Orleans.
painting-at-Ms-Ts
MDS volunteer paints at Ms. T's house in New Orleans.
Lorena-presents-prayer-shaw
Lorena presents a prayer shawl to the new homeowner at her house dedication.
Martha-June-Graber-presntin
Martha June presents a quilted wall hanging to new homeowner Lily and daughter Diedre at their home dedication in New Orleans.
cws volunteers
Volunteers from 10 CWS partner groups work together. MDS volunteers Dave Wiebe, Wayne Stuckey and Art Zacharias are in this group.-Matt Hackworth
CWS house
Insulating one of the CWS houses during the Building Blitz in New Orleans.
CWS Orientation meeting
Volunteers from all 10 faith-based organizations involved in the CWS project meet together at the beginning of the Building Blitz.
Roof of the CWS house
Working on the roof at the CWS house.
Roof work CWS
MDS volunteer works on the roof at a CWS house.
Framing
Framing at a CWS partnership house.
Insulation
The insulation is installed.
trusses
Handing up the trusses.
CWS framing
MDS volunteers work with other CWS volunteers to frame this house.
Working-in-the-Kitchen
Hard working cooks at the Mobile project.
Kenny-and-Brenda-house
The beginnings of Kenny and Brenda's house.
Mr. C s house
Working on the roof at Mr. C's house.
Ms. Toni's house
Ms. Tonis' house ready for sanding.
Clearing out Mr. Curtis house
Clearing out at Mr. Curtis' before the renovations can begin.
Working-on-the-foundation
Working on the foundation at a Livingston project.
Digging for the foundation
Digging for foundation work at a project in Livingston.
Ready-with-the-rebar
Ready with the rebar.
Pouring-Cement
Pouring cement for a firm foundation.
Drilling
Working on a project in Livingston, Texas.
Working-on-trusses
Working on trusses in Livingston, Texas.
Putting-up-a-wall
Framing up a new build in Livingston, Texas.
Project in Johnson Bayou
New build in Johnson Bayou.
Len working on the Siding
Len working on the siding.
Working on Project 3
Finishing the electrical work at project 3.
The very beginnings of a new home
The beginnings of a new home in Johnson Bayou.
Roofing in February.
Roofing despite the cold February weather.
Laying-flooring
Installing flooring at a project in Greensburg.
Priceless in Greensburg
Signs of rebuilding in Greensburg.
Roof work in Greensburg
Working on the roof in Greensburg.
Finishing the porch roof
Finishing the porch roof at a Greensburg project.
Installing-Windows
Installing windows.
Diamond-13
Handing up the trusses at a project in the Grand Bayou, Louisiana.
Diamond-16
Working on the raised houses in the Bayou.
Diamond-7
Going out for the day's work.
Relaxing-after-a-tough-day
Relaxing at the project after a tough day at work.
1-15-Wall-up-6
The first wall goes up at a new house in Diamond, Louisiana.
Maurice-2-6-09
Maurice's house shows lots of progress.
Conrad-Grebel-students-dig-
Student volunteers from Conrad Grebel University dig the hole to bury a septic system at a MDS house in the Grand Bayou.
MDS homeowner, Ruby, takes volunteers out on her boat.
Odile-being-painted-2-6-09
Painting at Odile's house.
Maurice-Kitchen-1-24-09
A volunteer conference in what will be Maurice's kitchen.
Philippe-quilt
This quilt will be given at a home dedication.
Odile-3-13-09
Odile's house nears completion.
Mr-Ron-coming-up-ramp-to-se
Mr. Ron goes up the ramp to see the inside of his house for the first time.
Tina-Esau-working-on-sofit-
Tina works on the soffit.
lunch-at-Rosinas
Volunteers in Diamond take a break for lunch in the Bayou.
Feb-2009---3
The first wall goes up.
Feb-2009---1
Working on the piers in Cameron.
Feb-2009---4
Our good cooks keep the volunteers happy.
feb-2009---8
Making sure everything is level.
Feb-2009---10
Securing the trusses.
feb-2009---12
The new house in Cameron.
Feb-2009---13
Installing house wrap.
feb-2009---16
Volunteers nail sheeting to the joists.
feb-2009---17
All the materials must be moved up to the work area.
feb-2009---20
Two walls are up.
Feb-2009---21
The first truss is set.
feb-2009---22
Halfway through the trusses.
Feb-2009---23
Working on the porch roof.
Drywall-in-the-closet
Hanging drywall in the closet.
finishing-the-concrete-pad
Making sure the concrete pad is finished right.
finishing-the-railing
Finishing touches on the railing.
finishing-the-railings
Building a sturdy railing for the steps.
hanging-drywall-2
Hanging drywall.
house-ready-for-siding
This house is ready for siding.
installing-doors
A volunteer installs the front door.
measuring-drywall
Measuring drywall for an accurate fit.
siding
Volunteers work on siding installation.
this-team-is-ready-to-go
This crew of volunteers is ready to work!
SilcoxExtendedFamily
The S family receives the keys to their new home.
SilcoxDedication 2
Presenting the S family with a quilted wall hanging.
S House Completed
Touring the completed home.
S Extended Family
The extended S family at the home dedication.
GaspardFamily
The G family on their new porch.
G Dedication 2
Presenting a wall hanging to the G family.
G House Completed
The completed house.
GaspardDediction 3
Giving the keys to the new homeowners at the house dedication.
SilcoxDedication 3
A beautiful quilt is given to the S family at their home dedication.